The Creative Energies Solution

Project: 22.88 kW Grid Tie Solar System,

Date of completion: May 5, 2014

Creative Energies was selected by The Jewish Community Center to design and install two solar arrays. A 20.8kW ballasted array located on a flat, membrane roof surface and a 2.08kW array located on the historic structure of the facility.  The 2.08kW array was installed to be visible to both facility members and the general public.  In addition to installing the solar system, Creative Energies completed a Rocky Mountain Power Community Blue Sky Grant application on behalf of the JCC and obtained full funding for the system.